Agenda item
PLANNING APPLICATION B 17 0513
Outline application for the erection of up to 35 no. dwellings (with layout and access to be considered) and construction of car park for use by Old Leake Primary School.
Land north of Old Main Road Old Leake Boston PE22 9HR
Messrs. A and J Daubney.
Minutes:
Outline application for the erection of up to 35 no. dwellings (with layout
and access to be considered) and construction of car park for use by Old
Leake Primary School
Land north of Old Main Road, Old Leake, Boston, PE22 9HR
Messrs A & J Daubney
The Senior Planning Officer presented the report to the committee confirming one update to the report tabled in that a third representation from a dwelling already referred to in the report had been recieved. The representation added nothing new to the those already received: it did emphasise the lack of need for the housing, the major impact on privacy in terms of looking into the front garden and issues in respect of flooding and the increased volume in car movemenets.
Representation was received from the applicant’s agent Mr Dowding which included the following:
Committee were advised that the landowners were farmers who had been resident in Old Leake their entire lives where they had raised their families and contributed greatly to the local community. Recognising the current need for housing the clients saw a good opportunity to develop land with the intention that it would benefit the whole community, through the provision of new homes including much needed affodable housing, public open space and a car park with the aim to improve traffic safety outside the school. The development would be attractive and low density providing detached and semi detached properties in a village location, close to local amenities for 35 dwellings which included an affordable contribution of 20% which was more than the required allocation, to maximise the use of the land. It was a sustainable development which would make use of a underused greenfield site. The site was currently used for grazing horses. The local primary school supported the application as did Lincolnshire Wildlife Trust. The site was located next to an existing residential development, adjacent to the settlement boundary and had been identifed as suitable for development in the 2017 SHLAA. Old Leake had been identifed as a minor service centre with development being directed to help support its role within the hieracrchy of the settlements in the borough
It was moved by Councillor Jonathan Noble and seconded by Councillor James Edwards that committee grant the application in line with officer recommendation and subject to the conditions and reasons therein.
Vote: In Favour: 12 Against: 0 Abstention(s): 0
RESOLVED: That the committee grant the application in line with officer recommendation subject to the following proviso’s, conditions and reasons:
a) any permission is not released until the applicants have entered into a section 106 planning obligation/unilateral undertaking with the Council relating to the provision of seven affordable housing units and a financial obligation of £67,965 towards providing one teaching classroom at Giles Academy in Old Leake,
and;
b) authority is delegated to the Development Control Manager to approve this application upon satisfactory completion of the planning obligation. If the obligation is not concluded within three months of instructions, the application will be returned to Committee.
1. No development shall commence until details of the appearance, landscaping, and scale of the development (hereafter referred to as the ‘reserved maters’) have been submitted to and approved by the local planning authority
Reason:
Required to be imposed pursuant to Section 92 of the Town and
Country Planning Act 1990. This is an outline application only and
such details must be approved before development commences, and to
accord with the objectives of Local Plan Policies G1 and H3 and
with the intentions of the NPPF (2012).
2. Application for approval of Reserved Matters shall be made to the local planning authority not later than the expiration of three years from the date of this permission.
Reason: Required to be imposed pursuant to Section 92 of the Town and Country Planning Act 1990.
3. The development hereby permitted shall be begun before the expiration of two years from the date of approval of the last of the reserved matters to be approved.
Reason:
Required to be imposed pursuant to Section 92 of the Town and
Country Planning Act 1990.
4. The development hereby permitted shall be carried out in accordance with the application forms, the submitted Design and Access Statement and the following plans:
§ Ref: ‘Site Location Plan’ (1/6)
§ Ref: B/3129-201 ‘Proposed Site Plan’ (3/6)
Reason: To ensure the development is undertaken in accordance with the approved details and to accord with Adopted Local Plan Policy G1.
5. Notwithstanding the details submitted within the supporting information the development shall include the following flood mitigation measures:
§ Finished floor levels shall be set no lower than 3.2m above Ordnance Datum (AOD)
§ Appropriate flood resistence and resilience measures shall be incorporated to no lower than 3.5m AOD
The mitigation measures shall be fully implemented prior to occupation and subsequently remain in place.
Reason: To reduce the risk of flooding to the proposed development and future occupiers in accordance with the intentions of the NPPF (2012).
6. Before each dwelling is occupied the roads and/or footways providing access to that dwelling, for the whole of its frontage, from an existing public highway, shall be constructed to a specification to enable them to be adopted as Highways Maintainable at the Public Expense, less the carriageway and footway surface courses.
The carriageway and footway surface courses shall be completed within three months from the date upon which the erection is commenced of the penultimate dwelling.
Reason: To ensure safe access to the site and each dwelling/building in the interests of residential amenity, convenience and safety and to accord with Adopted Plan Policies G1, G6 and H3.
7. No dwellings shall be commenced before the first 60 metres of estate road from its junction with the public highway, including visibility splays, as shown on drawing number B/3129-201 dated 19 October 2017 has been completed.
Reason: In the interests of safety of the users of the public highway and the safety of the users of the site and to enable calling vehicles to wait clear of the carriageway of Old Main Road and to accord with Adopted Plan Policies G1, G6 and H3.
8. Before any dwelling is commenced, all of that part of the estate road and associated footways that forms the junction with the main road and which will be constructed within the limits of the existing highway, shall be laid out and constructed to finished surface levels in accordance with details to be submitted and approved by the local planning authority.
Reason: In the interests of safety of the users of the public highway and the safety of the users of the site and to accord with Adopted Plan Policies G1, G6 and H3.
9. No development shall take place until a surface water drainage scheme for the site, based on sustainable drainage principles and an assessment of the hydrological and hydrogeological context of the development, has been submitted to and approved in writing by the local planning authority. The scheme shall:
(a) Provide details of
how run-off will be sfaely conveyed and attenuated during storms up
to and including the 1 in 100 year critical storm event, with an
allowance for climate change, from all hard surfaced areas within
the development into the existing local drainage infrastructure and
watercourse system without exceeding the run-off rate for the
undeveloped site;
(b) Provide attenuation details and discharge rates which, unless agreed otherwise by the surface water receiving body, shall be restricted to 1.4 litres per second per hectare;
(c) Provide details of
the timetable for and any phasing of implementation for the
drainage scheme; and
(d) Provide details of how the scheme shall be maintained and
managed over the lifetime of the development which shall include
the arrangements for adoption by any public authority or statutory
undertaker and any other arrangements to secure the operation of
the scheme throughout its lifetime.
The development shall be carried out in accordance with the approved drainage scheme and no dwelling shall be occupied until the approved scheme has been completed or provided on the site in accordance with the approved phasing. The approved scheme shall be retained and maintained in full in accordance with the approved details.
Reason:
In accordance with the details of the application and to ensure for
the satisfactory, sustainable drainage of the site, to ensure that
surface water run-off from the development will not adversely
affect, by reason of flooding, the safety amenity and convenience
of the residents of this site and vicinity and to accord with
Adopted Local Plan Policies G1 and G6. This is a pre-commencement
condition as the drainage strategy is a fundamental part of the
layout and the details need to be agreed prior to any form of
development taking place.
10. All landscape works shall be carried out in accordance with the approved details within 6 months of the date of the first occupation of the first dwelling. Any trees, plants, grassed areas which within a period of 5 years from the date of planting die, are removed or become seriously damaged or diseased shall be replaced in the first available planting season with others of similar size species or quality.
Reason: In the interests of visual amenity and in accordance with Section 197 of the 1990 Act which requires local planning authorities to ensure, where appropriate, adequate provision is made for the preservation or planting of trees, and to ensure that the approved scheme is implemented satisfactorily. The condition accords with Adopted Local Plan Policy G1.
11. A landscape management plan including management responsibilities and maintenance schedules of the public open space and school car parking area shall be submitted to and approved by the local planning authority before the occupation of any dwelling. The landscape management plan shall be carried out as approved thereafter.
Reason: To ensure the long term maintenance of the public open space and school car parking area in the interests of the amenity of residents and to accord with the objectives of Local Plan Policy H4
12. Prior to the commencement of the development hereby permitted, a Construction Management Plan shall be submitted to the local planning authority for approval. The Construction Management Plan will prescribe where site accommodation and welfare facilities will be placed, where site vehicles and the vehicles of site personnel will be parked and where materials will be delivered and stored within the site. Construction of the permitted development shall be undertaken in accordance with the approved Construction Management Plan.
Reason: In the interests of the safety and free passage of the public and to accord with the objectives of Local Plan policies G1 and G6.
13. The development shall proceed fully in accordance with the mitigation measures proposed within the submitted Ecology and Protected Species Survey prepared by Scarborough Nixon Associates.
Reason: To ensure that protected species and their habitats are protected and to provide enhancements to provide biodiversity in accordance with Adopted Plan Policy G2.
It is recorded that the Chairman adjourned the meeting
at this point in the proceeding.
The meeting reconvened at 1400 hours.
On reconvention of the meeting
Councillors Michael Cooper and Stephen Woodliffe had left the meeting and Councillor Paul Skinner had joined the meeting.