Outline application for 46 residential dwellings and associated works with all matters reserved for later approval
Land adjacent and to the rear of Fishtoft Scouts, Gaysfield Road, Fishtoft, Boston, PE21 0SF
John Saul Ltd C/O Clive Wicks Associates
Minutes:
Outline application for 46 residential dwellings and associated works with all matters reserved for later approval
Land adj and to the rear of Fishtoft Scouts, Gaysfield Road, Fishtoft, Boston, PE21 0SF
John Saul Ltd C/O Clive Wicks Associates
The Assistant Director - Planning presented the application as set out in the report.
Registered speakers addressed the Committee as follows, in summary.
Mr Roly Ashley, a neighbour, spoke in objection to the application on the following grounds on behalf of local residents. The Local Plan being out of date; the availability of nearby alternative brownfield sites; lack of facilities and economic growth in the village; congestion on the main road; inadequate drainage; highway safety due to lack of footpaths; inability of village roads to deal with heavy lorries; and the dangers of the blind road junction proposed.
Mr Clive Wicks, the applicant’s agent, described pre-application consultations as extensive. The site was one of the safest in terms of flood risk, was allocated in the Local Plan, and would contribute towards the borough’s overall need for housing. The layout was of good quality, the design attractive, there would be no over-looking and the open space would be in an appropriate location. There would be measures to protect wildlife, significant tree planting and a drain to deal with surface water run-off. The applicant would also provide toilet and parking facilities and a pedestrian crossover for the scout hall in addition to education and NHS contributions. All consultees approved of the application, which was in accordance with the Local Plan and the NPPF. There would be no adverse effect on properties on Gaysfield Road, though their view would be affected. The scheme was sustainable and would promote economic growth.
Parish Councillor Joff Williams spoke on behalf of Fishtoft Parish Council as its vice-chairman. The parish council opposed the application on several grounds. With respect to access and traffic volumes, the Highways Agency assessment was not agreed due to the significant additional traffic that the development would generate and the cumulative impact on the roads would be severe. The reduction in height of the proposed dwellings would not provide privacy for existing dwellings, as they would still be two-storey with upstairs windows. The character of the area would not be maintained, as the proposed 5-year plan was inadequate, as were the requirements for the maintenance of the open space. Brownfield sites were available across the borough and should be used before development on farmland. The number of units was in excess of the Local Plan allocation. There were inadequate local services and the NHS contribution would not address the financial impact of this number of new residents. There were also flood risk and archaeological impact concerns.
Councillor Judith Skinner, addressing the Committee as one of the Ward Members, asserted that the proposal was contrary to the aims of sustainable development, as the village had few local services and limited public transport. There was a substantial number of objections from local residents and properties in Gaysfield Road would suffer from worsening conditions after rainfall that would not be mitigated by an attenuation pond and the watercourse to be used was already at capacity. A management committee should be set up to deal with drainage if the application was granted. The access to the development was not satisfactory adjacent to the scout hut and would adversely affect road safety at school pick-up and drop-off times. The road was inadequate for additional traffic as could be seen if the Highways Authority and the Committee visited the site. There would be an adverse impact on the amenity and open aspect of existing dwellings that were mostly bungalows. Councillor Skinner added that the foul water was pumped to Freiston not Fishtoft.
Before opening the matter for debate, the Chairman confirmed that the Local Plan was up-to-date.
In response to speakers’ comments, the Assistant Director agreed it was unusual for access not to be specified at this stage, but that it was within the applicant’s rights and should not prevent Members’ determination. Even if there had been records of previous flooding, it would not preclude this development, as there was always a technical solution. Land levels raised by 300 mm-one of speakers-ODN – environment agency recommendation. Condition 11 equals not significant. This site was on good agricultural land; however, it had been allocated for development in the local plan; therefore, the principal had been set and it would be unreasonable not to grant permission. The area had been considered in detail during the local plan consultation exercise.
Members’ comments included:
· Satisfaction with the amount of detail in the application and confidence that the attached conditions would ensure the Reserved Matters application would look very similar to the indicative plan.
· The principle had been determined already and it would be extremely difficult to revisit the local plan decision.
· The layout was satisfactory, the proposal was attractive and nearby properties would not be overlooked, and development would attract facilities to the area.
· Sympathy for the objectors, but there was no reason not to approve the application.
A Member objected to the proposal on several grounds. It represented tandem back-land development; adverse impact on neighbour amenity and character of the area; lack of amenities and public transport; use of prime agricultural land contrary to the NPPF, which stated poor quality agricultural land be should be used instead of which there were ample alternative sites; visual intrusion and massing of properties.
In response, the Assistant Director pointed out that the design was a matter for Reserved Matters. Tandem development and effect on the character of an area was not necessarily harmful; it was the context. The site was part of land adopted in the Local Plan and the principle of development already accepted. There was no right to a view and amenity of neighbouring properties was a matter for reserved matters, which would consider window positions, separation distances etc.
Discussing the correct name of the drainage catchment area, the
Assistant Director pointed out that it appeared within the
statutory response from Anglian Water and if the name was
incorrect, it did not affect his recommendation. Under separate legislation, Anglian Water could
require the developer to do whatever was necessary to provide a
connection and, as the applicant was required to seek Anglian
Water‘s agreement for the proposal in accordance with
condition 8, Members should have full confidence in this
respect.
In response to a view that the proposed road junction should be
moved further down to avoid the section where traffic backed up,
the Assistant Director pointed out that the Highways authority had
no objections to the application.
As to whether the Reserved Matters application would be brought to
the Committee, the Assistant Director stated that this could be
recommended, but stressed it would have to be considered on its own
merits.
It was proposed by Councillor Yvonne Stevens and seconded by
Councillor Peter Bedford that outline planning permission be
granted as recommended by the Planning Officers.
Vote: 8 for, 2 against
RESOLVED: That outline planning permission be granted as recommended by the Planning Officers, subject to the satisfactory conclusion of a S106 Legal Agreement to secure the contributions towards Affordable Housing and other infrastructure and the following conditions:
1. No development shall commence until details of the access, appearance, landscaping, layout and scale of the development (hereafter referred to as the ‘reserved matters’) have been submitted and approved by the Local Planning Authority.
Those details shall conform to the design principles and layout shown in the approved indicative drawings 17-2397-01 Rev D Proposed Site Plan - Outline, 17-2397-CS-01 Cross Sections and 17-2397-MP-01 Rev F Proposed Masterplan.
Reason: This is an outline application only and such details must be approved before development commences in order to comply with the objectives of Policies 2 and 3 of the South East Lincolnshire Local Plan (2011-2036).
2. Application for approval of reserved matters shall be made to the Local Planning Authority not later than the expiration of four years from the date of this permission.
Reason: Required to be imposed pursuant to Section 51 of the Planning and Compulsory Purchase Act 2004.
3. The development hereby permitted shall be begun before the expiration of two years from the date of approval of the last of the reserved matters to be approved.
Reason: Required to be imposed pursuant to Section 51 of the Planning and Compulsory Purchase Act 2004.
4. Any application for approval of reserved matters submitted pursuant to condition 1 of this permission shall accord with the outline permission insofar as it relates to a maximum of 46 dwellings and the overall site area (as shown on Drawing No. 17-2397-01 Rev D Proposed Site Plan - Outline received by the LPA on 27/05/2021).
Reason: The application is granted in outline only in accordance with the provisions of Article 4 of the Town and Country Planning (Development Management Procedure) Order 2015. Any application for reserved matters must be in accordance with and/or not exceed the parameters established as part of this permission and to comply with Policies 2 and 3 of the South East Lincolnshire Local Plan (2011-2036).
5. No development shall take place until a written scheme of archaeological investigation has been submitted to and approved by the Local Planning Authority. This scheme should include the following:
1. An assessment of significance and proposed mitigation strategy (i.e. preservation by record, preservation in situ or a mix of these elements).
2. A methodology and timetable of site investigation and recording including provision for trial trenching based on the results of the geophysical survey and appraisal forming part of the approved outline application
3. Provision for site analysis
4. Provision for publication and dissemination of analysis and records
5. Provision for archive deposition
6. Nomination of a competent person/organisation to undertake the work
The scheme of archaeological investigation must only be undertaken in accordance with the approved details, and completed in accordance with the timetable within. No other works shall take place until the site investigation has been completed, unless agreed as part of the timetable.
Reason: To ensure the preparation and implementation of an appropriate scheme of archaeological mitigation in accordance with paragraph 199 of the National Planning Policy Framework.
6. Prior to the commencement of the development hereby permitted, a Construction Environment Management Plan (CEMP) shall be submitted to and approved in writing by the Local Planning Authority. The CEMP shall include (through not restricted to) the following details:
a) a traffic management plan incorporating the routing of construction traffic and details of heavy vehicle movement patterns (including the earliest and latest times, and the suspension of trips during peak traffic times )
b) hours of work for site preparation, delivery of materials and construction;
c) measures to minimise and control noise, vibration, dust, dirt and fumes during the development period
d) details of onsite parking facilities for both visiting construction vehicles and deliveries and workers on the site
e) the loading and unloading arrangements for heavy plant and machinery and materials
f) the location of storage of plant and materials used in constructing the development
g) measures to avoid disturbance to nesting birds and other wildlife
h) measures to prevent mud being deposited on the surrounding highway
i) the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate
j) details of any protective fencing to maintain public access and public safety for the public footpaths that cross/are adjacent to the site – including provisions relating traffic and pedestrians within the vicinity at such facilities as the School and Scout Hut.
k) a programme for the implementation of all of the above items.
Development shall then be carried out in strict accordance with the approved CEMP.
Reason: To satisfy Policy 2 and 30 of the South East Lincolnshire Local Plan (2011-2036) and to ensure that appropriate measures are put in place before any development commences to limit noise, nuisance and disturbance to the occupiers of neighbouring properties during the construction of the development and to prevent any obstruction of or disturbance to the operation of the Highway.
7. Submissions of reserved matters shall be accompanied by full details of a surface water drainage strategy and scheme based on the document ‘Sustainable Drainage Strategy’ forming part of the approved application. These details shall also include measures relating to the adoption or long-term maintenance of the surface water drainage system. The details shall be submitted to and approved in writing by the Local Planning Authority.
The development shall be carried out in accordance with the approved drainage scheme and no dwelling shall be occupied until the approved scheme has been completed or provided on the site in accordance with the approved phasing. The approved scheme shall be retained and maintained in full in accordance with the approved details.
Reason: To ensure residents of the permitted development, neighbouring land and neighbouring properties are not adversely affected, by reason of flooding, by the construction of the permitted development in accordance with Policies 2 and 4 of the South East Lincolnshire Local Plan (2011-2036).
8. Submissions of reserved matters shall be accompanied by full details of the proposed foul water drainage system including connection points to the public sewer, discharge rate and confirmation that the sewage authority has sufficient capacity to accept the flows; such details shall be submitted to and approved in writing by the Local Planning Authority.
The development shall be carried out in accordance with the approved drainage scheme and no dwelling shall be occupied until the approved scheme has been completed or provided on the site in accordance with the approved phasing. The approved scheme shall be retained and maintained in full in accordance with the approved details.
Reason: To ensure residents of the permitted development, neighbouring land and neighbouring properties are not adversely affected, by reason of flooding, by the construction of the permitted development in accordance with Policies 2 and 4 of the South East Lincolnshire Local Plan (2011-2036).
9. Submissions of reserved matters shall include a detailed scheme of scheme of landscaping and tree planting for the site indicating, inter alia, the number, species, heights on planting and positions of all the trees, together with details of post-planting maintenance, shall be submitted to and approved in writing by the Local Planning Authority. Such scheme shall be in accordance with the details shown in the approved drawings and the approved Biodiversity Appraisal and Biodiversity Management Plan.
The landscaping shall be carried out in its entirety within a period of the first planting season following the date on which development is completed or in line with a timetable agreed in writing by the Local Planning Authority.
Within the period of 5years following the last occupation of the development, all trees, shrubs and bushes shall be maintained by the owner or owners of the land on which they are situated and all losses shall be made good as and when necessary.
Reason: To ensure that appropriate landscaping is provided to integrate the site into the local area, in the interests of biodiversity and to accord with Policy 3 of the South East Lincolnshire Local Plan and paragraph 170 of the National Planning Policy Framework.
10. The development hereby permitted shall be implemented in strict accordance with the recommendations of the Biodiversity Assessment (CGC Ecology dated April 2021) and Biodiversity Management Plan (CGC Ecology dated April 2021) forming part of the approved application.
Submissions of reserved matters shall include full details of the biodiversity enhancement measures across the site and a timetable for their implementation. These measures should be in keeping with the principles set out in the Ecological Appraisal, Biodiversity Assessment and Biodiversity Management Plan forming part of the approved application. These measures should include details of proposals for landscaping, biodiversity net gain and the long term biodiversity management of the site, which shall be approved in writing by the Local Planning Authority prior to the commencement of any works and which shall be implemented in accordance with a timing plan to be agreed by the Local Planning Authority.
The works shall then be undertaken in accordance with the agreed details.
The site shall thereafter be managed in ecology terms based on those details contained within the Biodiversity Management Plan (CGC Ecology dated April 2021).
Reason - In the interest of enhancing the ecology of the area in compliance with Policies 2 and 28 of the South East Lincolnshire Local Plan (2011-2036).
11. The details of any reserved matters application shall include details of flood mitigation measures including a demonstration that:
§ the dwellings will be built using flood resilient construction techniques;
§ that there will be no ground floor sleeping accommodation;
§ that finished floor levels will be set a minimum of 4.66 metres above Ordnance Datum and;
§ that all dwellings will sign up to the Environment Agency flood warning service within one month of first occupation.
Reason: To reduce the risk of flooding to the proposed development and future occupants in accordance with Policy 4 of the South East Lincolnshire Local Plan (2011-2036).
12. Submissions of reserved matters relating to access shall include details of works to a improve the public highway through the provision of a 1.8m wide frontage footway link between the entrance road at the junction with Gaysfield Road and the existing footway on the east side of Gaysfield Road. Those details shall be provided for agreement in writing by the Local Planning Authority.
No dwelling shall be occupied until the identified works have been completed in full and the footway link is available for use.
Reason: To ensure the continuity of safe and suitable pedestrian access, in the interests of pedestrian and public safety, in accordance with Policy 2, 32 and 33 of the South East Lincolnshire Local Plan (2011-2036) and the guidance within the NPPF.
13. Prior to the commencement of development above slab level, final details of measures that aim to reduce pollution and promote renewable and low carbon energy (including measures such as facilities for EV car charging) and details relating to the timing of their implementation, shall be submitted to and approved in writing with the Local Planning Authority. The development shall be constructed in accordance with the approved measures.
Reason: To help reduce pollution and promote renewable and low carbon energy in new development schemes and to accord with Policies 2, 3, 30 and 31 of the South east Lincolnshire Local Plan (2011-2036) and to accord with the intentions of the National Planning Policy Framework (2019).
14. The water consumption of each dwelling hereby permitted should not exceed the requirement of 110 litres per person per day as set out as the optional requirement in Part G of the Building Regulations (2010) and the South East Lincolnshire Local Plan (2011-2036).
The person carrying out the work must inform the Building Control Body that this duty applies.
A notice confirming the requirement for the water consumption has been met shall be submitted to the Building Control Body and Local Planning Authority, no later than five days after the completion of each individual dwelling.
Reason: To protect the quality and quantity of water resources available to the district. This condition is imposed in accordance with Policy 31 of the South East Lincolnshire Local Plan (2011-0236).
15. None of the dwellings hereby approved shall be occupied until details of the public open space and how it is managed and maintained as part of the development has been submitted to and approved in writing by the Local Planning Authority. The scheme shall cover the full lifetime of the open space and drainage system and, as a minimum, shall include:
(i) details of the location, size, specification of the open space and how the POS will be landscaped (hard and soft) along with any play equipment or facilities;
(ii) arrangements for adoption by an appropriate public body or statutory undertaker, or management and maintenance by a Residents’ Management Company.
(iii) arrangements concerning funding mechanisms for the ongoing maintenance of all elements of the POS (including mechanical components) to include details such as:
§ on-going inspections relating to performance and asset condition assessments;
§ operation costs for regular maintenance, remedial works and irregular maintenance of limited life assets; and
§ any other arrangements to secure the operation of the surface water drainage scheme throughout its lifetime.
(iv) means of access and easements for maintenance purposes;
(v) A timetable for implementation.
The POS shall thereafter be installed in accordance with the details and timetable contained within the duly approved scheme, and shall be managed and maintained as such thereafter.
Reason: To ensure that satisfactory measures are put in place for the management and maintenance of the public open space area throughout the lifetime of the development and to accord with Policies 2, 3, 6 and 31 of the South East Lincolnshire Local Plan (2011-2036).
16. If, during development, contamination not previously considered is identified, then the Local Planning Authority shall be notified immediately and no further work shall be carried out until a method statement detailing a scheme for dealing with the suspect contamination has been submitted to and agreed in writing by the Local Planning Authority.
Reason: To ensure all contamination within the site is dealt with and to accord with Policies 2 and 30 of the South East Lincolnshire Local Plan (2011-2036).
17. Prior to the commencement of development, details of the proposed post and rail fence and gates to serve the enclosed field as shown on drawing 17-2397-AS-01 RevC shall be provided for agreement in writing by the Local Planning Authority.
No works, other than site investigation and clearance shall take place until the aforementioned fence and gates have been provided, and they shall be retained thereafter.
Reason: To ensure the continuity of safe and suitable pedestrian access, in the interests of pedestrian and public safety, in accordance with Policy 2, 32 and 33 of the South East Lincolnshire Local Plan (2011-2036) and the guidance within the NPPF.
Informatives:
Anglian Water
Anglian Water has assets close to or crossing this site or there are assets subject to an adoption agreement. Therefore the site layout should take this into account and accommodate those assets within either prospectively adoptable highways or public open space. If this is not practicable then the sewers will need to be diverted at the developers cost under Section 185 of the Water Industry Act 1991. or, in the case of apparatus under an adoption agreement, liaise with the owners of the apparatus. It should be noted that the diversion works should normally be completed before development can commence.
Notification of intention to connect to the public sewer under S106 of the Water Industry Act Approval and consent will be required by Anglian Water, under the Water Industry Act 1991. Contact Development Services Team 0345 606 6087.
Building near to a public sewer - No building will be permitted within the statutory easement width of 3 metres from the pipeline without agreement from Anglian Water. Please contact Development Services Team on 0345 606 6087.
The developer should note that the site drainage details submitted have not been approved for the purposes of adoption. If the developer wishes to have the sewers included in a sewer adoption agreement with Anglian Water (under Sections 104 of the Water Industry Act 1991), they should contact our Development Services Team on 0345 606 6087 at the earliest opportunity. Sewers intended for adoption should be designed and constructed in accordance with Sewers for Adoption guide for developers, as supplemented by Anglian Water’s requirements.
STATEMENT OF PROACTIVE WORKING:
In determining this application, the authority has taken account of the guidance in paragraph 38 of the National Planning Policy Framework 2019 in order to seek to secure sustainable development that improves the economic, social and environmental conditions of the Borough.
Supporting documents: